Services

One signature. Every system.

From a 5,000 sq.ft office fit-out to a 4 lakh sq.ft factory — the same partner signs your drawings, supervises your installation and answers your service calls.

Ventilation grills viewed from below
01Practice

Central HVAC Design & Build

Heat-load calculation, system selection, ducting design, installation and commissioning of chilled-water, VRF and DX systems for commercial and institutional spaces.

  • Chillers
  • VRF / VRV
  • AHUs & FCUs
  • Chilled-water piping
02Practice

Industrial Ventilation

Fresh-air, exhaust, dust collection, fume extraction and positive-pressurisation systems engineered for manufacturing plants, kitchens, parking basements and warehouses.

  • Dust collection
  • Fume hoods
  • Pressurisation
  • Stack design
03Practice

MEP Contracting

Single-window mechanical, electrical, plumbing and fire-fighting execution. Coordinated BIM drawings, snag-free installation and joint commissioning with civil teams.

  • Electrical
  • Plumbing
  • Fire-fighting
  • BMS integration
04Practice

Cleanroom & Pharma

Class 10,000 – 1,00,000 cleanrooms, controlled environments and process cooling for pharmaceutical, electronics and food-grade facilities with full validation support.

  • HEPA filtration
  • Validation docs
  • Temperature mapping
05Practice

Retrofit & Energy Audit

Audit existing systems, identify energy losses and execute retrofits — variable-speed drives, EC fans, controls upgrades and refrigerant migration with measured payback.

  • Energy audit
  • VFDs
  • Controls upgrade
06Practice

Service & AMC

Annual maintenance contracts with planned preventive visits, spares-on-call, and a 24×7 break-down desk. Average response time under four hours across NCR.

  • PPM visits
  • 24×7 desk
  • Spare parts

Engagement

How a project flows.

We protect your timeline by being honest about ours. Most engagements move through four stages — and at every stage, you know the next milestone, the named owner, and the decisions waiting on you.

  1. STAGE 01

    Brief

    Site walk, requirements, constraints — captured by a senior engineer, not a salesperson.

  2. STAGE 02

    Design

    Heat loads, single-line diagrams, equipment selection and a transparent BOQ.

  3. STAGE 03

    Build

    In-house teams execute under a named project manager with weekly photo-reports.

  4. STAGE 04

    Run

    Commissioning, training, documentation, then a 12-month defect-liability and AMC option.

Premium HVAC?

Our hospitality-grade systems live under AirInfinitys.

Visit AirInfinitys ↗